Public Notice: Request for Proposal
Stuart Island Fire Station Professional Services Bid Solicitation
Stuart Island Fire Station Professional Services Bid Solicitation
Pursuant to RCW 39.80 San Juan County Fire Protection District No. 3 is soliciting proposals from qualified architectural and engineering firms for the “shovel ready” design of a new fire station located on Stuart Island, WA.
The proposed facility will qualify as an Owner Builder project under County code with a total square footage not to exceed 999 sq ft including:
- Two garage doors specified for apparatus access\
- Rainwater catchment
-5,000 gallon catchment tank on pedestal
- Water tank plumbed to valved 2.5” NH and accessible to fire truck refill
- Water tank privacy screened to road frontage\
- Outdoor covered meeting and rest area
The project site is located on Stuart Island, a remote-access location within San Juan County, Washington. The property is owned and operated by San Juan County School District No. 149 and is made available to the Fire District under an existing License Agreement. All design and construction plans must be reviewed and approved by the School District. Building site faces road frontage, locating may require conditional use variance from County.
The selected firm will provide full architectural and engineering services including:
- Site evaluation and specification\
- Design development and construction documents\
All proposals must be received no later than September 30, 2025. Electronic submissions are not accepted. Late submissions will not be considered.
Submit proposals to:
ATTN: Fire Chief Noel Monin RE: STUART ISLAND
San Juan County Fire Protection District No. 3
1011 Mullis Street
Friday Harbor, WA 98250
For questions or to arrange a site visit, please contact the Fire District office. 360-378-5334